Outfitted with the zero leak bidirectional checking sole-noid valves, this energy unit is intended for that operation of two independent circuits. Which are respectively for that main and subordinate platforms on the double scissors lift. Two cut-off valves are employed for lowering the machine manually in case of electrical power reduction. If much more independent circuits are necessary for your application please speak to us for availability.
Remark: one. Please check with our product sales engineer to the distinct pump displacement, motor energy or tank capability.
2. CSA or UL licensed motors can be found on request.
Specific Notes
one. The AC motor is of S3 duty cycle, which might only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all the hydraulic components concerned ahead of set up of the electrical power unit.
three. Viscosity on the oil shoud be 15~46 cst,as well as oil should be clean and absolutely free of impurities,N46 hydraulic oil is encouraged.
4. The energy unit should really be mounted vertically.
5. Check the oil level during the tank following the original operating with the electrical power unit.
six. Oil shifting is needed just after the original 100 operation hrs,afterwards once each 3000 hours.